saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

Ludvika Town Hall in Ludvika, Sweden
Ludvika Town Hall

1938 · Ludvika, Ludvika, Sweden

Ludvika Town Hall image

Building in Ludvika, Sweden

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

Ludvika Town Hall

Ludvika, Ludvika, Sweden · Exact work coordinates

OpenStreetMap
Field
Ludvika Town HallLudvika Town Hall

1938 · Ludvika, Ludvika, Sweden

Studio Lina Bo BardiStudio Lina Bo Bardi

1951-1992 · Sao Paulo, Brazil

Typeworkbureau
Year / years19381951-1992
PlaceLudvika, Ludvika, SwedenSao Paulo, Brazil
Place contextLudvika, Ludvika, SwedenRepresentative site: Sao Paulo, Brazil
Climate12°C · 15.1h daylight · 8 km/h wind23°C · 11.4h daylight · 8 km/h wind · via Casa de Vidro
FocusHouse3 works in corpus
Architects
  • Cyrillus Johansson
  • Lina Bo Bardi
Linked context

Bureaus

  • Cyrillus Johansson

Notable works

  • Casa de Vidro
  • Sao Paulo Museum of Art
  • SESC Pompeia
Typologies
  • house
  • church
  • sacred space
  • residence
  • house
  • museum
  • cultural building
  • civic building
  • adaptive reuse
  • cultural center
  • sports and leisure
Materials

Not recorded yet.

  • glass
  • concrete
  • steel
  • brick
Carbon signals

house, church, and sacred space gives us a typology starting point even though the work does not have a recorded material palette yet.

No dominant drivers yet.

Concrete, Steel, and Brick look like the main embodied-carbon drivers in the current palette.

  • Concrete
  • Steel
  • Brick
Lower-carbon levers

No levers surfaced yet.

  • Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
  • Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
  • Review masonry extent, reuse opportunities, and alternate assemblies where the design language allows it.
  • Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
AccessibilityPublicly accessible3 of 3 recorded works are publicly accessible
Related books

No linked books yet.