| Type | work | bureau |
|---|
| Year / years | Unknown | 1951-1992 |
|---|
| Place | Casablanca, Casablanca, Morocco | Sao Paulo, Brazil |
|---|
| Place context | Casablanca, Casablanca, Morocco | Representative site: Sao Paulo, Brazil |
|---|
| Climate | Climate unavailable | Climate unavailable · via Casa de Vidro |
|---|
| Focus | Office building | 3 works in corpus |
|---|
| Architects | | |
|---|
| Linked context | Bureaus | Notable works - Casa de Vidro
- Sao Paulo Museum of Art
- SESC Pompeia
|
|---|
| Typologies | | - residence
- house
- museum
- cultural building
- civic building
- adaptive reuse
- cultural center
- sports and leisure
|
|---|
| Materials | Not recorded yet. | |
|---|
| Carbon signals | transport hub, tower, and office gives us a typology starting point even though the work does not have a recorded material palette yet. No dominant drivers yet. | Concrete, Steel, and Brick look like the main embodied-carbon drivers in the current palette. |
|---|
| Lower-carbon levers | No levers surfaced yet. | - Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
- Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
- Review masonry extent, reuse opportunities, and alternate assemblies where the design language allows it.
- Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
|
|---|
| Accessibility | Access not recorded | 3 of 3 recorded works are publicly accessible |
|---|
| Related books | No linked books yet. | |
|---|