saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

Onagawa Station in Onagawa, Japan
Onagawa Station

1939 · Onagawa, Onagawa, Japan

Onagawa Station image

Railway station in Onagawa, Miyagi Prefecture, Japan

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

Onagawa Station

Onagawa, Onagawa, Japan · Exact work coordinates

OpenStreetMap
Field
Onagawa StationOnagawa Station

1939 · Onagawa, Onagawa, Japan

Lev RudnevLev Rudnev

1920-1956 · Moscow, Moscow, Russia

Typeworkbureau
Year / years19391920-1956
PlaceOnagawa, Onagawa, JapanMoscow, Moscow, Russia
Place contextOnagawa, Onagawa, JapanRepresentative site: Nizhny Novgorod, Nizhny Novgorod, Russia
Climate16°C · 13.4h daylight · 12 km/h wind-1°C · 14.7h daylight · 13 km/h wind · via Chkalov Stairs
FocusPerformance venue7 works in corpus
Architects
  • Shigeru Ban
  • Lev Rudnev
Linked context

Bureaus

  • Shigeru Ban Architects

Notable works

  • Chkalov Stairs
  • Main building of Moscow State University
  • Main Building of the Ministry of Defense (Russia)
  • Government House, Baku
Typologies
  • performance venue
  • tower
  • education
  • campus building
  • building
  • housing
  • house
  • civic building
  • cultural center
Materials

Not recorded yet.

  • stone
  • steel
  • concrete
Carbon signals

performance venue gives us a typology starting point even though the work does not have a recorded material palette yet.

No dominant drivers yet.

Concrete, Steel, and Stone look like the main embodied-carbon drivers in the current palette.

  • Concrete
  • Steel
  • Stone
Lower-carbon levers

No levers surfaced yet.

  • Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
  • Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
  • Check source geography, fabrication intensity, and whether stone is structural, cladding, or finish-only.
AccessibilityPublicly accessible2 of 2 recorded works are publicly accessible
Related books

No linked books yet.

No linked books yet.