saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

Santa Maria dell'Anima in Rome, Italy
Santa Maria dell'Anima

1522 · Rome, Rome, Italy

Santa Maria dell'Anima image

Church in Rome, Italy

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

Santa Maria dell'Anima

Rome, Rome, Italy · Exact work coordinates

OpenStreetMap
Field
Santa Maria dell'AnimaSanta Maria dell'Anima

1522 · Rome, Rome, Italy

Lacaton & Vassal

Dunkirk, Nord-Pas-de-Calais, France

Typeworkbureau
Year / years1522Unrecorded
PlaceRome, Rome, ItalyDunkirk, Nord-Pas-de-Calais, France
Place contextRome, Rome, ItalyRepresentative site: Boulevard Bessières, Paris 17e Arrondissement, Paris, Île-de-France, France
Climate14°C · 13.6h daylight · 2 km/h wind8°C · 14.0h daylight · 9 km/h wind · via Tour Bois le Pretre
FocusSacred building4 works in corpus
Architects
  • Donato Bramante
  • Anne Lacaton
  • Jean-Philippe Vassal
  • Lacaton & Vassal
Linked context

Bureaus

  • Donato Bramante

Notable works

  • Tour Bois le Pretre
  • FRAC Dunkerque
  • Polyvalent Theater
  • Grand Parc Bordeaux
Typologies
  • church
  • sacred space
  • housing
  • renovation
  • social housing
  • cultural
  • museums exhibit
  • exhibition center
  • theaters performance
  • theater
Materials

Not recorded yet.

  • concrete
  • glass
  • polycarbonate
  • steel
Carbon signals

church and sacred space gives us a typology starting point even though the work does not have a recorded material palette yet.

No dominant drivers yet.

Concrete, Steel, and Glass look like the main embodied-carbon drivers in the current palette.

  • Concrete
  • Steel
  • Glass
Lower-carbon levers

No levers surfaced yet.

  • Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
  • Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
  • Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
  • Use classification and product-level EPD research to place this material more precisely.
AccessibilityPublicly accessible0 of 2 recorded works are publicly accessible
Related books

No linked books yet.