| Type | work | bureau |
|---|
| Year / years | 1989 | 1987 |
|---|
| Place | Rotterdam, Rotterdam, Netherlands | Paris, Ile-de-France, France |
|---|
| Place context | Prinsenhoofd, Feijenoord, Rotterdam, Zuid-Holland, Nederland | Representative site: Place du Minck, Centre-Ville, Dunkerque, Hauts-de-France, France |
|---|
| Climate | 10°C · 13.7h daylight · 14 km/h wind | 10°C · 13.6h daylight · 21 km/h wind · via FRAC Nord-Pas de Calais |
|---|
| Focus | Architecture | 2 works in corpus |
|---|
| Architects | | - Anne Lacaton
- Jean-Philippe Vassal
|
|---|
| Linked context | Bureaus | Notable works - FRAC Nord-Pas de Calais
- Grand Parc Bordeaux
|
|---|
| Typologies | | - museum
- adaptive reuse
- cultural building
- housing
- renovation
- social housing
|
|---|
| Materials | Not recorded yet. | - steel
- glass
- polycarbonate
- concrete
|
|---|
| Carbon signals | infrastructure gives us a typology starting point even though the work does not have a recorded material palette yet. No dominant drivers yet. | Concrete, Steel, and Glass look like the main embodied-carbon drivers in the current palette. |
|---|
| Lower-carbon levers | No levers surfaced yet. | - Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
- Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
- Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
- Use classification and product-level EPD research to place this material more precisely.
|
|---|
| Accessibility | Access not recorded | 1 of 2 recorded works are publicly accessible |
|---|
| Related books | No linked books yet. | |
|---|