saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

Post Tower in Stadtbezirk Bonn, Germany
Post Tower

2002 · Stadtbezirk Bonn, Stadtbezirk Bonn, Germany

Post Tower image

Headquarters of the DHL Group

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

Post Tower

Stadtbezirk Bonn, Stadtbezirk Bonn, Germany · Exact work coordinates

OpenStreetMap
Field
Post TowerPost Tower

2002 · Stadtbezirk Bonn, Stadtbezirk Bonn, Germany

KPFKPF

Seoul, South Korea

Typeworkbureau
Year / years2002Unrecorded
PlaceStadtbezirk Bonn, Stadtbezirk Bonn, GermanySeoul, South Korea
Place contextStadtbezirk Bonn, Stadtbezirk Bonn, GermanyRepresentative site: Chicago, Chicago, United States
Climate13°C · 14.1h daylight · 11 km/h wind7°C · 13.6h daylight · 13 km/h wind · via 333 Wacker Drive
FocusArchitecture104 works in corpus
Architects
  • Helmut Jahn
  • Kohn Pedersen Fox
Linked context

Bureaus

  • Murphy/Jahn

Notable works

  • 333 Wacker Drive
  • One Logan Square
  • One Tabor Center
  • Fifth Third Center (Nashville)
Typologies
  • tower
  • office
  • building
  • tower
  • landscape
  • church
  • sacred space
  • civic building
  • hospitality
Materials

Not recorded yet.

  • aluminum
  • concrete
  • stone
  • glass
  • steel
  • brick
  • bamboo
Carbon signals

tower gives us a typology starting point even though the work does not have a recorded material palette yet.

No dominant drivers yet.

Aluminum, Concrete, and Steel look like the main embodied-carbon drivers in the current palette.

  • Aluminum
  • Concrete
  • Steel
Lower-carbon levers

No levers surfaced yet.

  • Focus on recycled content, lighter assemblies, and careful facade-specification choices.
  • Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
  • Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
  • Use classification and product-level EPD research to place this material more precisely.
AccessibilityAccess not recorded31 of 31 recorded works are publicly accessible
Related books

No linked books yet.

No linked books yet.