| Type | work | bureau |
|---|
| Year / years | Unknown | Unrecorded |
|---|
| Place | Casablanca, Casablanca, Morocco | Seoul, South Korea |
|---|
| Place context | Main Street شارع رئيسي, Préfecture d'arrondissement de Hay Hassani عمالة مقاطعة الحي الحسني, Casablanca Finance City القطب المالي للدار البيضاء, Casablanca ⵜⴰⴷⴷⴰⵔⵜ ⵜⵓⵎⵍⵉⵍⵜ الدار البيضاء, Casablanca-Settat ⵜⴰⴷⴷⴰⵔⵜ ⵜⵓⵎⵍⵉⵍⵜ-ⵙⵟⵟⴰⵜ الدار البيضاء-سطات, Maroc ⵍⵎⵖⵔⵉⴱ المغرب | Representative site: West Upper Wacker Drive, Loop, Chicago, Illinois, United States |
|---|
| Climate | 18°C · 13.3h daylight · 10 km/h wind | 21°C · 13.8h daylight · 19 km/h wind · via 333 Wacker Drive |
|---|
| Focus | Office building | 104 works in corpus |
|---|
| Architects | | |
|---|
| Linked context | Bureaus | Notable works - 333 Wacker Drive
- One Logan Square
- One Tabor Center
- Fifth Third Center (Nashville)
|
|---|
| Typologies | | - office
- building
- tower
- landscape
- church
- sacred space
- civic building
- hospitality
|
|---|
| Materials | Not recorded yet. | - aluminum
- concrete
- stone
- glass
- steel
- brick
- bamboo
|
|---|
| Carbon signals | transport hub, tower, and office gives us a typology starting point even though the work does not have a recorded material palette yet. No dominant drivers yet. | Aluminum, Concrete, and Steel look like the main embodied-carbon drivers in the current palette. |
|---|
| Lower-carbon levers | No levers surfaced yet. | - Focus on recycled content, lighter assemblies, and careful facade-specification choices.
- Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
- Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
- Use classification and product-level EPD research to place this material more precisely.
|
|---|
| Accessibility | Access not recorded | 31 of 31 recorded works are publicly accessible |
|---|
| Related books | No linked books yet. | No linked books yet. |
|---|