saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

No plan or image is recorded for this slot yet.
Stadtcasino Basel

Unknown · Basel, Basel, Switzerland

Basel, Basel, Switzerland

9°C · 13.9h daylight · 2 km/h wind

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

Stadtcasino Basel

Basel, Basel, Switzerland · Exact work coordinates

OpenStreetMap

Stadtcasino Basel

Image 1

Basel, Basel, Switzerland

Climate: 9°C · 13.9h daylight · 2 km/h wind

Mapping: Exact work coordinates

Field
Stadtcasino Basel

Unknown · Basel, Basel, Switzerland

Kevin Roche John Dinkeloo and AssociatesKevin Roche John Dinkeloo and Associates

1966 · Dublin, Leinster, Ireland

Typeworkbureau
Year / yearsUnknown1966
PlaceBasel, Basel, SwitzerlandDublin, Leinster, Ireland
Place contextBasel, Basel, SwitzerlandRepresentative site: Dublin, Leinster, Ireland
Climate9°C · 13.9h daylight · 2 km/h wind8°C · 14.3h daylight · 5 km/h wind · via Convention Centre Dublin
FocusArchitecture1 works in corpus
Architects
  • Melchior Berri
  • Kevin Roche
Linked context

Bureaus

  • Melchior Berri

Notable works

  • Convention Centre Dublin
Typologies
  • building
  • civic building
  • convention center
Materials

Not recorded yet.

  • glass
  • steel
  • concrete
Carbon signals

building gives us a typology starting point even though the work does not have a recorded material palette yet.

No dominant drivers yet.

Concrete, Steel, and Glass look like the main embodied-carbon drivers in the current palette.

  • Concrete
  • Steel
  • Glass
Lower-carbon levers

No levers surfaced yet.

  • Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
  • Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
  • Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
AccessibilityAccess not recorded1 of 1 recorded works are publicly accessible
Related books

No linked books yet.

No linked books yet.