saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

Crown Prince Bridge in Bezirk Mitte, Germany
Crown Prince Bridge

1996 · Bezirk Mitte, Bezirk Mitte, Germany

Crown Prince Bridge image

Bridge in Berlin, quarters of Tiergarten and Mitte

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

Crown Prince Bridge

Bezirk Mitte, Bezirk Mitte, Germany · Exact work coordinates

OpenStreetMap
Field
Crown Prince BridgeCrown Prince Bridge

1996 · Bezirk Mitte, Bezirk Mitte, Germany

Kevin Roche John Dinkeloo and AssociatesKevin Roche John Dinkeloo and Associates

1966 · Dublin, Leinster, Ireland

Typeworkbureau
Year / years19961966
PlaceBezirk Mitte, Bezirk Mitte, GermanyDublin, Leinster, Ireland
Place contextBezirk Mitte, Bezirk Mitte, GermanyRepresentative site: Dublin, Leinster, Ireland
Climate7°C · 14.3h daylight · 11 km/h wind9°C · 14.3h daylight · 10 km/h wind · via Convention Centre Dublin
FocusCivic building1 works in corpus
Architects
  • Santiago Calatrava
  • Kevin Roche
Linked context

Bureaus

  • Santiago Calatrava

Notable works

  • Convention Centre Dublin
Typologies
  • infrastructure
  • civic building
  • landscape
  • civic building
  • convention center
Materials

Not recorded yet.

  • glass
  • steel
  • concrete
Carbon signals

infrastructure, civic building, and landscape gives us a typology starting point even though the work does not have a recorded material palette yet.

No dominant drivers yet.

Concrete, Steel, and Glass look like the main embodied-carbon drivers in the current palette.

  • Concrete
  • Steel
  • Glass
Lower-carbon levers

No levers surfaced yet.

  • Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
  • Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
  • Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
AccessibilityPublicly accessible1 of 1 recorded works are publicly accessible
Related books

No linked books yet.

No linked books yet.