saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

No plan or image is recorded for this slot yet.
Kahlenberg Transmitter

Unknown · Vienna, Vienna, Austria

Vienna, Vienna, Austria

6°C · 14.0h daylight · 12 km/h wind

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

Kahlenberg Transmitter

Vienna, Vienna, Austria · Exact work coordinates

OpenStreetMap

Kahlenberg Transmitter

Image 1

Vienna, Vienna, Austria

Climate: 6°C · 14.0h daylight · 12 km/h wind

Mapping: Exact work coordinates

Field
Kahlenberg Transmitter

Unknown · Vienna, Vienna, Austria

Kenzo Tange AssociatesKenzo Tange Associates

1946 · Tokyo, Tokyo, Japan

Typeworkbureau
Year / yearsUnknown1946
PlaceVienna, Vienna, AustriaTokyo, Tokyo, Japan
Place contextVienna, Vienna, AustriaRepresentative site: Minneapolis, Minneapolis, United States
Climate6°C · 14.0h daylight · 12 km/h wind17°C · 13.8h daylight · 26 km/h wind · via Minneapolis Institute of Art
FocusArchitecture28 works in corpus
Architects
  • Gustav Peichl
  • Kenzo Tange
Linked context

Bureaus

  • Gustav Peichl

Notable works

  • Minneapolis Institute of Art
  • Assumption of Mary Cathedral, Hiroshima
  • Grand Prince Hotel Akasaka
  • Hiroshima Peace Memorial Museum
Typologies
  • tower
  • museum
  • church
  • sacred space
  • cathedral
  • memorial
  • hospitality
  • landscape
  • sports venue
Materials
  • steel
  • concrete
Carbon signals

Steel look like the main embodied-carbon drivers in the current palette.

  • Steel

Concrete look like the main embodied-carbon drivers in the current palette.

  • Concrete
Lower-carbon levers
  • Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
  • Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
AccessibilityAccess not recorded13 of 13 recorded works are publicly accessible
Related books

No linked books yet.

No linked books yet.