saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

Tour Légende in Puteaux, France
Tour Légende

2001 · Puteaux, Puteaux, France

Tour Légende image

Office in La Défense

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

Tour Légende

Puteaux, Puteaux, France · Exact work coordinates

OpenStreetMap
Field
Tour LégendeTour Légende

2001 · Puteaux, Puteaux, France

KAZGOR Design Academy

Almaty, Almaty, Kazakhstan

Typeworkbureau
Year / years2001Unrecorded
PlacePuteaux, Puteaux, FranceAlmaty, Almaty, Kazakhstan
Place contextPuteaux, Puteaux, FranceRepresentative site: Almaty, Almaty, Kazakhstan
Climate10°C · 14.1h daylight · 14 km/h wind8°C · 13.7h daylight · 4 km/h wind · via Nurly Tau Business Center
FocusOffice building1 works in corpus
Architects
  • I. M. Pei

No architects linked yet.

Linked context

Bureaus

  • I. M. Pei & Partners

Notable works

  • Nurly Tau Business Center
Typologies
  • office
  • housing
  • residential complex
  • mixed-use
Materials

Not recorded yet.

  • reinforced concrete
  • glass
  • steel
Carbon signals

office gives us a typology starting point even though the work does not have a recorded material palette yet.

No dominant drivers yet.

Concrete, Steel, and Glass look like the main embodied-carbon drivers in the current palette.

  • Concrete
  • Steel
  • Glass
Lower-carbon levers

No levers surfaced yet.

  • Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
  • Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
  • Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
AccessibilityAccess not recorded1 of 1 recorded works are publicly accessible
Related books

No linked books yet.

No linked books yet.