| Type | work | bureau |
|---|
| Year / years | 1940 | Unrecorded |
|---|
| Place | Pittsburgh, Pittsburgh, United States | Almaty, Almaty, Kazakhstan |
|---|
| Place context | Pittsburgh, Pittsburgh, United States | Representative site: Almaty, Almaty, Kazakhstan |
|---|
| Climate | 3°C · 13.5h daylight · 11 km/h wind | 19°C · 13.7h daylight · 12 km/h wind · via Nurly Tau Business Center |
|---|
| Focus | Housing | 1 works in corpus |
|---|
| Architects | | No architects linked yet. |
|---|
| Linked context | Bureaus | Notable works - Nurly Tau Business Center
|
|---|
| Typologies | | - housing
- residential complex
- mixed-use
|
|---|
| Materials | Not recorded yet. | - reinforced concrete
- glass
- steel
|
|---|
| Carbon signals | housing and house gives us a typology starting point even though the work does not have a recorded material palette yet. No dominant drivers yet. | Concrete, Steel, and Glass look like the main embodied-carbon drivers in the current palette. |
|---|
| Lower-carbon levers | No levers surfaced yet. | - Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
- Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
- Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
|
|---|
| Accessibility | Access not recorded | 1 of 1 recorded works are publicly accessible |
|---|
| Related books | No linked books yet. | No linked books yet. |
|---|