| Type | work | bureau |
|---|
| Year / years | 1977-1986 | 1888 |
|---|
| Place | Sao Paulo, Brazil | Zurich, Zurich, Switzerland |
|---|
| Place context | Rua Clélia, Pompéia, São Paulo, São Paulo, Brasil | Representative site: Laurenzenvorstadt, Telli, Aarau, Aargau, Schweiz/Suisse/Svizzera/Svizra |
|---|
| Climate | 25°C · 11.6h daylight · 13 km/h wind | 17°C · 13.4h daylight · 2 km/h wind · via Old Cantonal School Aarau |
|---|
| Focus | Cultural and sports center | 4 works in corpus |
|---|
| Architects | | |
|---|
| Linked context | Bureaus | Notable works - Old Cantonal School Aarau
- St. Paul's Church, Basel
- St. Paul's Church, Bern
- Basel Badischer Bahnhof
|
|---|
| Typologies | - adaptive reuse
- cultural center
- sports and leisure
| - education
- church
- sacred space
- gallery
- tower
- performance venue
|
|---|
| Materials | | |
|---|
| Carbon signals | Concrete, Steel, and Brick look like the main embodied-carbon drivers in the current palette. | Glass and Stone look like the main embodied-carbon drivers in the current palette. |
|---|
| Lower-carbon levers | - Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
- Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
- Review masonry extent, reuse opportunities, and alternate assemblies where the design language allows it.
| - Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
- Check source geography, fabrication intensity, and whether stone is structural, cladding, or finish-only.
|
|---|
| Accessibility | Publicly accessible | 4 of 4 recorded works are publicly accessible |
|---|
| Related books | | No linked books yet. |
|---|