saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

Lilla Bommen (building) in Gothenburg, Sweden
Lilla Bommen (building)

1989 · Gothenburg, Gothenburg, Sweden

Lilla Bommen (building) image

Office in Gothenburg, Sweden

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

Lilla Bommen (building)

Gothenburg, Gothenburg, Sweden · Exact work coordinates

OpenStreetMap
Field
Lilla Bommen (building)Lilla Bommen (building)

1989 · Gothenburg, Gothenburg, Sweden

Karl MoserKarl Moser

1888 · Zurich, Zurich, Switzerland

Typeworkbureau
Year / years19891888
PlaceGothenburg, Gothenburg, SwedenZurich, Zurich, Switzerland
Place contextGothenburg, Gothenburg, SwedenRepresentative site: Aarau, Aarau, Switzerland
Climate14°C · 14.8h daylight · 21 km/h wind17°C · 13.9h daylight · 6 km/h wind · via Old Cantonal School Aarau
FocusHousing4 works in corpus
Architects
  • Ralph Erskine
  • Karl Moser
Linked context

Bureaus

  • Ralph Erskine

Notable works

  • Old Cantonal School Aarau
  • St. Paul's Church, Basel
  • St. Paul's Church, Bern
  • Basel Badischer Bahnhof
Typologies
  • housing
  • house
  • office
  • education
  • church
  • sacred space
  • gallery
  • tower
  • performance venue
Materials

Not recorded yet.

  • stone
  • glass
Carbon signals

housing, house, and office gives us a typology starting point even though the work does not have a recorded material palette yet.

No dominant drivers yet.

Glass and Stone look like the main embodied-carbon drivers in the current palette.

  • Glass
  • Stone
Lower-carbon levers

No levers surfaced yet.

  • Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
  • Check source geography, fabrication intensity, and whether stone is structural, cladding, or finish-only.
AccessibilityAccess not recorded4 of 4 recorded works are publicly accessible
Related books

No linked books yet.

No linked books yet.