saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

Estádio José Alvalade in Lumiar, Portugal
Estádio José Alvalade

2003 · Lumiar, Lumiar, Portugal

Estádio José Alvalade image

Football stadium in Lisbon, Portugal

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

Estádio José Alvalade

Lumiar, Lumiar, Portugal · Exact work coordinates

OpenStreetMap
Field
Estádio José AlvaladeEstádio José Alvalade

2003 · Lumiar, Lumiar, Portugal

Julio VilamajoJulio Vilamajo

1920-1948 · Montevideo, Montevideo Department, Uruguay

Typeworkbureau
Year / years20031920-1948
PlaceLumiar, Lumiar, PortugalMontevideo, Montevideo Department, Uruguay
Place contextLumiar, Lumiar, PortugalRepresentative site: Montevideo, Montevideo Department, Uruguay
Climate20°C · 13.4h daylight · 5 km/h wind19°C · 11.0h daylight · 15 km/h wind · via Vilamajo House Museum
FocusArchitecture1 works in corpus
Architects
  • Tomas Taveira
  • Julio Vilamajo
Linked context

Bureaus

  • Atelier Tomás Taveira

Notable works

  • Vilamajo House Museum
Typologies
  • sports venue
  • house
  • museum
  • residence
Materials

Not recorded yet.

  • masonry
  • stucco
  • timber
Carbon signals

sports venue gives us a typology starting point even though the work does not have a recorded material palette yet.

No dominant drivers yet.

Brick and Stucco look like the main embodied-carbon drivers in the current palette.

  • Brick
  • Stucco
Lower-carbon levers

No levers surfaced yet.

  • Review masonry extent, reuse opportunities, and alternate assemblies where the design language allows it.
  • Use classification and product-level EPD research to place this material more precisely.
  • Track sourcing, certification, and assembly logic rather than assuming timber is automatically low impact.
AccessibilityAccess not recorded1 of 1 recorded works are publicly accessible
Related books

No linked books yet.

No linked books yet.