saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

BOK Tower in Tulsa, United States
BOK Tower

1976 · Tulsa, Tulsa, United States

BOK Tower image

Skyscraper in Tulsa, Oklahoma, US

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

BOK Tower

Tulsa, Tulsa, United States · Exact work coordinates

OpenStreetMap
Field
BOK TowerBOK Tower

1976 · Tulsa, Tulsa, United States

Joze PlecnikJoze Plecnik

Ljubljana, Central Slovenia, Slovenia

Typeworkbureau
Year / years1976Unrecorded
PlaceTulsa, Tulsa, United StatesLjubljana, Central Slovenia, Slovenia
Place contextTulsa, Tulsa, United StatesRepresentative site: Hradčany, Hradčany, Czech Republic
Climate20°C · 13.2h daylight · 17 km/h wind20°C · 13.9h daylight · 17 km/h wind · via Prague Castle
FocusArchitecture14 works in corpus
Architects
  • Minoru Yamasaki
  • Joze Plecnik
Linked context

Bureaus

  • Yamasaki & Associates

Notable works

  • Prague Castle
  • Žale
  • Church of the Most Sacred Heart of Our Lord
  • Church of St. Anthony of Padua, Belgrade
Typologies
  • tower
  • building
  • performance venue
  • church
  • sacred space
  • chapel
  • cathedral
  • library
  • civic building
Materials

Not recorded yet.

  • timber
  • stone
Carbon signals

tower gives us a typology starting point even though the work does not have a recorded material palette yet.

No dominant drivers yet.

Stone look like the main embodied-carbon drivers in the current palette.

  • Stone
Lower-carbon levers

No levers surfaced yet.

  • Check source geography, fabrication intensity, and whether stone is structural, cladding, or finish-only.
  • Track sourcing, certification, and assembly logic rather than assuming timber is automatically low impact.
AccessibilityAccess not recorded9 of 9 recorded works are publicly accessible
Related books

No linked books yet.

No linked books yet.