saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

31 Building in Seoul, South Korea
31 Building

1970 · Seoul, Seoul, South Korea

31 Building image

Seed wave 36 image for 31 Building.

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

31 Building

Seoul, Seoul, South Korea · Exact work coordinates

OpenStreetMap
Field
31 Building31 Building

1970 · Seoul, Seoul, South Korea

Joseph PoelaertJoseph Poelaert

1850 · Brussels, Brussels-Capital Region, Belgium

Typeworkbureau
Year / years19701850
PlaceSeoul, Seoul, South KoreaBrussels, Brussels-Capital Region, Belgium
Place contextSeoul, Seoul, South KoreaRepresentative site: Brussels, Brussels, Belgium
Climate8°C · 13.4h daylight · 1 km/h wind9°C · 14.3h daylight · 12 km/h wind · via Church of Our Lady of Laeken
FocusOffice building5 works in corpus
Architects
  • Kim Chung-up
  • Joseph Poelaert
Linked context

Bureaus

  • Kim Chung-up

Notable works

  • Church of Our Lady of Laeken
  • Palace of Justice, Brussels
  • Church of St. Catherine, Brussels
  • La Monnaie
Typologies
  • tower
  • office
  • church
  • sacred space
  • courthouse
  • civic building
  • monumental architecture
  • house
  • performance venue
Materials
  • concrete
  • steel
  • glass
  • stone
Carbon signals

Concrete, Steel, and Glass look like the main embodied-carbon drivers in the current palette.

  • Concrete
  • Steel
  • Glass

Stone look like the main embodied-carbon drivers in the current palette.

  • Stone
Lower-carbon levers
  • Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
  • Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
  • Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
  • Check source geography, fabrication intensity, and whether stone is structural, cladding, or finish-only.
AccessibilityAccess not recorded5 of 5 recorded works are publicly accessible
Related books

No linked books yet.

No linked books yet.