saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

No plan or image is recorded for this slot yet.
Pilgramgasse station

1898 · Margareten, Margareten, Austria

Margareten, Margareten, Austria

16°C · 13.9h daylight · 13 km/h wind

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

Pilgramgasse station

Margareten, Margareten, Austria · Exact work coordinates

OpenStreetMap

Pilgramgasse station

Image 1

Margareten, Margareten, Austria

Climate: 16°C · 13.9h daylight · 13 km/h wind

Mapping: Exact work coordinates

Field
Pilgramgasse station

1898 · Margareten, Margareten, Austria

Typeworkbureau
Year / years1898Unrecorded
PlaceMargareten, Margareten, AustriaUnrecorded
Place contextMargareten, Margareten, AustriaRepresentative site: Chatsworth, Chatsworth, United Kingdom
Climate16°C · 13.9h daylight · 13 km/h wind11°C · 14.3h daylight · 10 km/h wind · via Emperor Fountain
FocusArchitecture6 works in corpus
Architects
  • Otto Wagner
  • Joseph Paxton
Linked context

Bureaus

  • Otto Wagner

Notable works

  • Emperor Fountain
  • The Crystal Palace
  • Château de Ferrières
  • Château de Pregny
Typologies
  • building
  • house
  • cathedral
  • sacred space
  • landscape
  • education
  • campus building
  • building
Materials

Not recorded yet.

  • glass
  • timber
Carbon signals

building gives us a typology starting point even though the work does not have a recorded material palette yet.

No dominant drivers yet.

Glass look like the main embodied-carbon drivers in the current palette.

  • Glass
Lower-carbon levers

No levers surfaced yet.

  • Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
  • Track sourcing, certification, and assembly logic rather than assuming timber is automatically low impact.
AccessibilityAccess not recorded2 of 2 recorded works are publicly accessible
Related books

No linked books yet.

No linked books yet.