saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

Gran Torre Costanera in Santiago, Chile
Gran Torre Costanera

2014 · Santiago, Santiago Metropolitan Region, Chile

Gran Torre Costanera image

Seed wave 38 image for Gran Torre Costanera.

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

Gran Torre Costanera

Santiago, Santiago Metropolitan Region, Chile · Exact work coordinates

OpenStreetMap
Field
Gran Torre CostaneraGran Torre Costanera

2014 · Santiago, Santiago Metropolitan Region, Chile

Joseph Allen SteinJoseph Allen Stein

1952 · New Delhi, Delhi, India

Typeworkbureau
Year / years20141952
PlaceSantiago, Santiago Metropolitan Region, ChileNew Delhi, Delhi, India
Place contextSantiago, Santiago Metropolitan Region, ChileRepresentative site: Mumbai, Mumbai, India
Climate15°C · 11.1h daylight · 7 km/h wind30°C · 12.7h daylight · 3 km/h wind · via Express Towers
FocusOffice tower2 works in corpus
Architects

No architects linked yet.

  • Joseph Allen Stein
Linked context

Bureaus

No linked context yet.

Notable works

  • Express Towers
  • India Habitat Centre
Typologies
  • tower
  • office
  • mixed-use
  • tower
  • housing
Materials
  • glass
  • steel
  • concrete
  • stone
Carbon signals

Concrete, Steel, and Glass look like the main embodied-carbon drivers in the current palette.

  • Concrete
  • Steel
  • Glass

Stone look like the main embodied-carbon drivers in the current palette.

  • Stone
Lower-carbon levers
  • Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
  • Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
  • Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
  • Check source geography, fabrication intensity, and whether stone is structural, cladding, or finish-only.
AccessibilityPublicly accessibleAccess not recorded across linked works
Related books

No linked books yet.

No linked books yet.