saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

No plan or image is recorded for this slot yet.
Erasmus Bridge

1996 · Rotterdam, South Holland, Netherlands

Rotterdam, South Holland, Netherlands

15°C · 14.3h daylight · 18 km/h wind

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

Erasmus Bridge

Rotterdam, South Holland, Netherlands · City-level coordinates only

OpenStreetMap

Erasmus Bridge

Image 1

Rotterdam, South Holland, Netherlands

Climate: 15°C · 14.3h daylight · 18 km/h wind

Mapping: City-level coordinates only

Field
Erasmus Bridge

1996 · Rotterdam, South Holland, Netherlands

José Marques da SilvaJosé Marques da Silva

1896 · Porto, Porto District, Portugal

Typeworkbureau
Year / years19961896
PlaceRotterdam, South Holland, NetherlandsPorto, Porto District, Portugal
Place contextRotterdam, South Holland, NetherlandsRepresentative site: Lordelo do Ouro e Massarelos, Lordelo do Ouro e Massarelos, Portugal
Climate15°C · 14.3h daylight · 18 km/h wind17°C · 13.6h daylight · 15 km/h wind · via Serralves
FocusBridge4 works in corpus
Architects

No architects linked yet.

  • Jose Marques da Silva
Linked context

Bureaus

No linked context yet.

Notable works

  • Serralves
  • Casa Correia de Matos
  • São Bento railway station
  • São João National Theatre
Typologies
  • bridge
  • infrastructure
  • landmark
  • museum
  • landscape
  • house
  • building
  • performance venue
Materials
  • steel

Not recorded yet.

Carbon signals

Steel look like the main embodied-carbon drivers in the current palette.

  • Steel

museum, landscape, house, and building gives us a typology starting point even though the work does not have a recorded material palette yet.

No dominant drivers yet.

Lower-carbon levers
  • Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.

No levers surfaced yet.

AccessibilityPublicly accessible2 of 2 recorded works are publicly accessible
Related books

No linked books yet.

No linked books yet.