saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

No plan or image is recorded for this slot yet.
Guangzhou Opera House

2010 · Guangzhou, Guangdong, China

Guangzhou, Guangdong, China

Climate unavailable

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

No coordinates are recorded for the current selection yet.

Guangzhou Opera House

Image 1

Guangzhou, Guangdong, China

Climate: Climate unavailable

Mapping: Coordinates not recorded

Field
Guangzhou Opera HouseGuangzhou Opera House

2010 · Guangzhou, Guangdong, China

Jo Coenen Architects & UrbanistsJo Coenen Architects & Urbanists

1987 · Amsterdam, North Holland, Netherlands

Typeworkbureau
Year / years20101987
PlaceGuangzhou, Guangdong, ChinaAmsterdam, North Holland, Netherlands
Place contextGuangzhou, Guangdong, ChinaRepresentative site: Amsterdam, Amsterdam, Netherlands
ClimateClimate unavailable9°C · 14.3h daylight · 8 km/h wind · via DeLaMar
FocusOpera house3 works in corpus
Architects

No architects linked yet.

  • Jo Coenen
Linked context

Bureaus

No linked context yet.

Notable works

  • DeLaMar
  • Netherlands Architecture Institute
  • Vesteda Toren
Typologies
  • opera house
  • cultural building
  • performing arts
  • performance venue
  • museum
  • library
  • tower
Materials
  • granite
  • glass
  • steel

Not recorded yet.

Carbon signals

Steel, Glass, and Stone look like the main embodied-carbon drivers in the current palette.

  • Steel
  • Glass
  • Stone

performance venue, museum, library, and tower gives us a typology starting point even though the work does not have a recorded material palette yet.

No dominant drivers yet.

Lower-carbon levers
  • Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
  • Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
  • Check source geography, fabrication intensity, and whether stone is structural, cladding, or finish-only.

No levers surfaced yet.

AccessibilityPublicly accessible2 of 2 recorded works are publicly accessible
Related books

No linked books yet.

No linked books yet.