| Type | work | bureau |
|---|
| Year / years | 1924 | 1987 |
|---|
| Place | Lima, Lima Province, Peru | Amsterdam, North Holland, Netherlands |
|---|
| Place context | Lima, Lima Province, Peru | Representative site: Amsterdam, Amsterdam, Netherlands |
|---|
| Climate | 22°C · 11.8h daylight · 7 km/h wind | 8°C · 14.3h daylight · 11 km/h wind · via DeLaMar |
|---|
| Focus | Hotel | 3 works in corpus |
|---|
| Architects | | |
|---|
| Linked context | Bureaus | Notable works - DeLaMar
- Netherlands Architecture Institute
- Vesteda Toren
|
|---|
| Typologies | - hotel
- historic building
- urban landmark
| - performance venue
- museum
- library
- tower
|
|---|
| Materials | - masonry
- concrete
- ornamental stone
| Not recorded yet. |
|---|
| Carbon signals | Concrete, Brick, and Stone look like the main embodied-carbon drivers in the current palette. | performance venue, museum, library, and tower gives us a typology starting point even though the work does not have a recorded material palette yet. No dominant drivers yet. |
|---|
| Lower-carbon levers | - Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
- Review masonry extent, reuse opportunities, and alternate assemblies where the design language allows it.
- Check source geography, fabrication intensity, and whether stone is structural, cladding, or finish-only.
| No levers surfaced yet. |
|---|
| Accessibility | Publicly accessible | 2 of 2 recorded works are publicly accessible |
|---|
| Related books | No linked books yet. | No linked books yet. |
|---|