saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

Bank of Georgia headquarters in Tbilisi, Georgia
Bank of Georgia headquarters

1975 · Tbilisi, Tbilisi, Georgia

Bank of Georgia headquarters image

Seed wave 54 image for the Bank of Georgia headquarters.

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

Bank of Georgia headquarters

Tbilisi, Tbilisi, Georgia · Exact work coordinates

OpenStreetMap

Bank of Georgia headquarters

Hero image

Seed wave 54 image for the Bank of Georgia headquarters.

Credit:

Rights: Unknown · unknown

Field
Bank of Georgia headquartersBank of Georgia headquarters

1975 · Tbilisi, Tbilisi, Georgia

Jo Coenen Architects & UrbanistsJo Coenen Architects & Urbanists

1987 · Amsterdam, North Holland, Netherlands

Typeworkbureau
Year / years19751987
PlaceTbilisi, Tbilisi, GeorgiaAmsterdam, North Holland, Netherlands
Place contextTbilisi, Tbilisi, GeorgiaRepresentative site: Amsterdam, Amsterdam, Netherlands
Climate10°C · 13.6h daylight · 21 km/h wind9°C · 14.2h daylight · 15 km/h wind · via DeLaMar
FocusOffice building3 works in corpus
Architects
  • George Chakhava
  • Jo Coenen
Linked context

Bureaus

  • George Chakhava

Notable works

  • DeLaMar
  • Netherlands Architecture Institute
  • Vesteda Toren
Typologies
  • office building
  • civic building
  • late modernism
  • performance venue
  • museum
  • library
  • tower
Materials
  • concrete
  • glass

Not recorded yet.

Carbon signals

Concrete and Glass look like the main embodied-carbon drivers in the current palette.

  • Concrete
  • Glass

performance venue, museum, library, and tower gives us a typology starting point even though the work does not have a recorded material palette yet.

No dominant drivers yet.

Lower-carbon levers
  • Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
  • Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.

No levers surfaced yet.

AccessibilityPrivate or restricted2 of 2 recorded works are publicly accessible
Related books

No linked books yet.

No linked books yet.