| Type | work | bureau |
|---|
| Year / years | 1985 | 1945-2003 |
|---|
| Place | Minami-Aoyama, Minami-Aoyama, Japan | Casablanca, Casablanca-Settat, Morocco |
|---|
| Place context | 青山通り, 南青山五丁目, 港区, 日本 | Representative site: Rue Charif Raadi Atlas, Agdal ⴰⴳⴷⴰⵍ أكدال, Fès ⴼⴰⵙ فاس, Fès-Meknès ⴼⴰⵙ-ⵎⴽⵏⴰⵙ فاس-مكناس, Maroc ⵍⵎⵖⵔⵉⴱ المغرب |
|---|
| Climate | 12°C · 13.1h daylight · 2 km/h wind | 14°C · 13.0h daylight · 3 km/h wind · via Sidi Harazem Bath Complex |
|---|
| Focus | Architecture | 1 works in corpus |
|---|
| Architects | | |
|---|
| Linked context | Bureaus | Notable works - Sidi Harazem Bath Complex
|
|---|
| Typologies | | - spa
- leisure
- landscape
- civic complex
|
|---|
| Materials | Not recorded yet. | |
|---|
| Carbon signals | building gives us a typology starting point even though the work does not have a recorded material palette yet. No dominant drivers yet. | Concrete look like the main embodied-carbon drivers in the current palette. |
|---|
| Lower-carbon levers | No levers surfaced yet. | - Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
|
|---|
| Accessibility | Access not recorded | 1 of 1 recorded works are publicly accessible |
|---|
| Related books | No linked books yet. | No linked books yet. |
|---|