| Type | work | bureau |
|---|
| Year / years | 2009 | 1945-2003 |
|---|
| Place | Dublin, Leinster, Ireland | Casablanca, Casablanca-Settat, Morocco |
|---|
| Place context | Dublin, Leinster, Ireland | Representative site: Casablanca, Casablanca, Morocco |
|---|
| Climate | 10°C · 14.5h daylight · 25 km/h wind | 17°C · 13.3h daylight · 4 km/h wind · via Vincent Timsit Workshop |
|---|
| Focus | Bridge | 3 works in corpus |
|---|
| Architects | No architects linked yet. | |
|---|
| Linked context | Bureaus No linked context yet. | Notable works - Vincent Timsit Workshop
- Sidi Harazem Bath Complex
- Assunna Mosque
|
|---|
| Typologies | - bridge
- infrastructure
- civic structure
| - office
- spa
- leisure
- landscape
- civic complex
- church
- sacred space
- mosque
|
|---|
| Materials | | |
|---|
| Carbon signals | Concrete and Steel look like the main embodied-carbon drivers in the current palette. | Concrete look like the main embodied-carbon drivers in the current palette. |
|---|
| Lower-carbon levers | - Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
- Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
| - Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
|
|---|
| Accessibility | Publicly accessible | 2 of 2 recorded works are publicly accessible |
|---|
| Related books | No linked books yet. | No linked books yet. |
|---|