| Type | work | bureau |
|---|
| Year / years | 2002 | 1945-2003 |
|---|
| Place | Melbourne, Victoria, Australia | Casablanca, Casablanca-Settat, Morocco |
|---|
| Place context | Melbourne, Victoria, Australia | Representative site: Casablanca, Casablanca, Morocco |
|---|
| Climate | 20°C · 11.0h daylight · 10 km/h wind | 17°C · 13.2h daylight · 2 km/h wind · via Vincent Timsit Workshop |
|---|
| Focus | Civic complex | 3 works in corpus |
|---|
| Architects | No architects linked yet. | |
|---|
| Linked context | Bureaus No linked context yet. | Notable works - Vincent Timsit Workshop
- Sidi Harazem Bath Complex
- Assunna Mosque
|
|---|
| Typologies | - civic building
- public square
- cultural building
| - office
- spa
- leisure
- landscape
- civic complex
- church
- sacred space
- mosque
|
|---|
| Materials | | |
|---|
| Carbon signals | Glass, Stone, and Zinc look like the main embodied-carbon drivers in the current palette. | Concrete look like the main embodied-carbon drivers in the current palette. |
|---|
| Lower-carbon levers | - Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
- Check source geography, fabrication intensity, and whether stone is structural, cladding, or finish-only.
- Use classification and product-level EPD research to place this material more precisely.
| - Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
|
|---|
| Accessibility | Publicly accessible | 2 of 2 recorded works are publicly accessible |
|---|
| Related books | No linked books yet. | No linked books yet. |
|---|