| Type | work | bureau |
|---|
| Year / years | 1975 | 1945-2003 |
|---|
| Place | Tbilisi, Tbilisi, Georgia | Casablanca, Casablanca-Settat, Morocco |
|---|
| Place context | Tbilisi, Tbilisi, Georgia | Representative site: Casablanca, Casablanca, Morocco |
|---|
| Climate | 10°C · 13.6h daylight · 21 km/h wind | 18°C · 13.2h daylight · 2 km/h wind · via Vincent Timsit Workshop |
|---|
| Focus | Office building | 3 works in corpus |
|---|
| Architects | | |
|---|
| Linked context | Bureaus | Notable works - Vincent Timsit Workshop
- Sidi Harazem Bath Complex
- Assunna Mosque
|
|---|
| Typologies | - office building
- civic building
- late modernism
| - office
- spa
- leisure
- landscape
- civic complex
- church
- sacred space
- mosque
|
|---|
| Materials | | |
|---|
| Carbon signals | Concrete and Glass look like the main embodied-carbon drivers in the current palette. | Concrete look like the main embodied-carbon drivers in the current palette. |
|---|
| Lower-carbon levers | - Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
- Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
| - Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
|
|---|
| Accessibility | Private or restricted | 2 of 2 recorded works are publicly accessible |
|---|
| Related books | No linked books yet. | No linked books yet. |
|---|