| Type | work | bureau |
|---|
| Year / years | 2008 | 1860 |
|---|
| Place | Doha, Ad-Dawhah, Qatar | Zurich, Zurich, Switzerland |
|---|
| Place context | Doha, Ad-Dawhah, Qatar | Representative site: Zurich, Zurich, Switzerland |
|---|
| Climate | 27°C · 12.9h daylight · 6 km/h wind | 8°C · 13.9h daylight · 5 km/h wind · via Zürich Hauptbahnhof |
|---|
| Focus | Museum | 13 works in corpus |
|---|
| Architects | | |
|---|
| Linked context | Bureaus | Notable works - Zürich Hauptbahnhof
- Frauenfeld railway station
- Sulgen railway station
- Weinfelden railway station
|
|---|
| Typologies | - museum
- cultural building
- waterfront architecture
| - building
- performance venue
|
|---|
| Materials | | Not recorded yet. |
|---|
| Carbon signals | Glass and Stone look like the main embodied-carbon drivers in the current palette. | building and performance venue gives us a typology starting point even though the work does not have a recorded material palette yet. No dominant drivers yet. |
|---|
| Lower-carbon levers | - Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
- Check source geography, fabrication intensity, and whether stone is structural, cladding, or finish-only.
| No levers surfaced yet. |
|---|
| Accessibility | Publicly accessible | 4 of 4 recorded works are publicly accessible |
|---|
| Related books | No linked books yet. | No linked books yet. |
|---|