saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

Harpa concert hall in Reykjavik, Iceland
Harpa

2011 · Reykjavik, Capital Region, Iceland

Harpa concert hall image

Seed wave 43 image for Harpa.

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

Harpa

Reykjavik, Capital Region, Iceland · Exact work coordinates

OpenStreetMap
Field
HarpaHarpa

2011 · Reykjavik, Capital Region, Iceland

Jakob Friedrich WannerJakob Friedrich Wanner

1860 · Zurich, Zurich, Switzerland

Typeworkbureau
Year / years20111860
PlaceReykjavik, Capital Region, IcelandZurich, Zurich, Switzerland
Place contextReykjavik, Capital Region, IcelandRepresentative site: Zurich, Zurich, Switzerland
Climate5°C · 16.0h daylight · 10 km/h wind12°C · 14.1h daylight · 7 km/h wind · via Zürich Hauptbahnhof
FocusConcert hall and conference centre13 works in corpus
Architects

No architects linked yet.

  • Jakob Friedrich Wanner
Linked context

Bureaus

No linked context yet.

Notable works

  • Zürich Hauptbahnhof
  • Frauenfeld railway station
  • Sulgen railway station
  • Weinfelden railway station
Typologies
  • concert hall
  • conference center
  • cultural building
  • building
  • performance venue
Materials
  • glass
  • steel
  • concrete

Not recorded yet.

Carbon signals

Concrete, Steel, and Glass look like the main embodied-carbon drivers in the current palette.

  • Concrete
  • Steel
  • Glass

building and performance venue gives us a typology starting point even though the work does not have a recorded material palette yet.

No dominant drivers yet.

Lower-carbon levers
  • Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
  • Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
  • Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.

No levers surfaced yet.

AccessibilityPublicly accessible4 of 4 recorded works are publicly accessible
Related books

No linked books yet.

No linked books yet.