saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

Beirut Terraces in Beirut, Lebanon
Beirut Terraces

2011-2017 · Beirut, Beirut Governorate, Lebanon

Beirut Terraces image

Seed wave 49 image for Beirut Terraces.

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

Beirut Terraces

Beirut, Beirut Governorate, Lebanon · Exact work coordinates

OpenStreetMap
Field
Beirut TerracesBeirut Terraces

2011-2017 · Beirut, Beirut Governorate, Lebanon

Jakob Friedrich WannerJakob Friedrich Wanner

1860 · Zurich, Zurich, Switzerland

Typeworkbureau
Year / years2011-20171860
PlaceBeirut, Beirut Governorate, LebanonZurich, Zurich, Switzerland
Place contextBeirut, Beirut Governorate, LebanonRepresentative site: Zurich, Zurich, Switzerland
ClimateClimate unavailableClimate unavailable · via Zürich Hauptbahnhof
FocusResidential tower13 works in corpus
Architects
  • Jacques Herzog
  • Pierre de Meuron
  • Jakob Friedrich Wanner
Linked context

Bureaus

  • Herzog & de Meuron

Notable works

  • Zürich Hauptbahnhof
  • Frauenfeld railway station
  • Sulgen railway station
  • Weinfelden railway station
Typologies
  • housing
  • residential tower
  • high-rise
  • building
  • performance venue
Materials
  • concrete
  • glass
  • stone

Not recorded yet.

Carbon signals

Concrete, Glass, and Stone look like the main embodied-carbon drivers in the current palette.

  • Concrete
  • Glass
  • Stone

building and performance venue gives us a typology starting point even though the work does not have a recorded material palette yet.

No dominant drivers yet.

Lower-carbon levers
  • Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
  • Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
  • Check source geography, fabrication intensity, and whether stone is structural, cladding, or finish-only.

No levers surfaced yet.

AccessibilityPrivate or restricted4 of 4 recorded works are publicly accessible
Related books

No linked books yet.

No linked books yet.