saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

4 World Trade Center in Manhattan, United States
4 World Trade Center

2008 · Manhattan, Manhattan, United States

4 World Trade Center image

Office skyscraper in Manhattan, New York

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

4 World Trade Center

Manhattan, Manhattan, United States · Exact work coordinates

OpenStreetMap
Field
4 World Trade Center4 World Trade Center

2008 · Manhattan, Manhattan, United States

Jakob Friedrich WannerJakob Friedrich Wanner

1860 · Zurich, Zurich, Switzerland

Typeworkbureau
Year / years20081860
PlaceManhattan, Manhattan, United StatesZurich, Zurich, Switzerland
Place contextManhattan, Manhattan, United StatesRepresentative site: Zurich, Zurich, Switzerland
Climate5°C · 13.5h daylight · 14 km/h wind8°C · 13.9h daylight · 8 km/h wind · via Zürich Hauptbahnhof
FocusHouse13 works in corpus
Architects
  • Fumihiko Maki
  • Jakob Friedrich Wanner
Linked context

Bureaus

  • Maki and Associates

Notable works

  • Zürich Hauptbahnhof
  • Frauenfeld railway station
  • Sulgen railway station
  • Weinfelden railway station
Typologies
  • house
  • tower
  • building
  • performance venue
Materials
  • concrete
  • glass
  • steel

Not recorded yet.

Carbon signals

Concrete, Steel, and Glass look like the main embodied-carbon drivers in the current palette.

  • Concrete
  • Steel
  • Glass

building and performance venue gives us a typology starting point even though the work does not have a recorded material palette yet.

No dominant drivers yet.

Lower-carbon levers
  • Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
  • Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
  • Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.

No levers surfaced yet.

AccessibilityAccess not recorded4 of 4 recorded works are publicly accessible
Related books

No linked books yet.

No linked books yet.