saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

Riverwalk Kitakyushu in Muromachi, Japan
Riverwalk Kitakyushu

2003 · Muromachi, Muromachi, Japan

Riverwalk Kitakyushu image

Japanese shopping mall

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

Riverwalk Kitakyushu

Muromachi, Muromachi, Japan · Exact work coordinates

OpenStreetMap
Field
Riverwalk KitakyushuRiverwalk Kitakyushu

2003 · Muromachi, Muromachi, Japan

Hiroshi Naito Architect & AssociatesHiroshi Naito Architect & Associates

1981 · Tokyo, Tokyo, Japan

Typeworkbureau
Year / years20031981
PlaceMuromachi, Muromachi, JapanTokyo, Tokyo, Japan
Place context国道199号, 小倉北区, 室町一丁目, 北九州市, 日本Representative site: 旭川駅北口広場, 神楽, 宮下通八丁目, 旭川市, 日本
Climate14°C · 13.3h daylight · 2 km/h wind6°C · 13.8h daylight · 20 km/h wind · via Asahikawa Station
FocusMuseum7 works in corpus
Architects
  • Michael Graves
  • Hiroshi Naito
Linked context

Bureaus

  • Michael Graves Architecture & Design

Notable works

  • Asahikawa Station
  • Takayama Station
  • Makino Botanical Garden
  • Tenshin Memorial Museum of Art, Ibaraki
Typologies
  • museum
  • performance venue
  • office
  • performance venue
  • landscape
  • museum
  • memorial
Materials

Not recorded yet.

  • timber
Carbon signals

museum, performance venue, and office gives us a typology starting point even though the work does not have a recorded material palette yet.

No dominant drivers yet.

The recorded material palette leans lower-carbon on paper, but procurement and quantity still matter.

No dominant drivers yet.

Lower-carbon levers

No levers surfaced yet.

  • Track sourcing, certification, and assembly logic rather than assuming timber is automatically low impact.
AccessibilityPublicly accessible7 of 7 recorded works are publicly accessible
Related books

No linked books yet.

No linked books yet.