| Type | work | bureau |
|---|
| Year / years | 2017 | 1958 |
|---|
| Place | Bordeaux, Nouvelle-Aquitaine, France | Amsterdam, North Holland, Netherlands |
|---|
| Place context | Bordeaux, Nouvelle-Aquitaine, France | Representative site: Utrecht, Utrecht, Netherlands |
|---|
| Climate | 24°C · 13.7h daylight · 11 km/h wind | 14°C · 14.2h daylight · 13 km/h wind · via Muziekcentrum Vredenburg |
|---|
| Focus | Housing renovation | 2 works in corpus |
|---|
| Architects | - Anne Lacaton
- Jean-Philippe Vassal
| |
|---|
| Linked context | Bureaus | Notable works - Muziekcentrum Vredenburg
- TivoliVredenburg
|
|---|
| Typologies | - housing
- renovation
- social housing
| |
|---|
| Materials | - concrete
- glass
- polycarbonate
| Not recorded yet. |
|---|
| Carbon signals | Concrete, Glass, and Polycarbonate look like the main embodied-carbon drivers in the current palette. - Concrete
- Glass
- Polycarbonate
| building gives us a typology starting point even though the work does not have a recorded material palette yet. No dominant drivers yet. |
|---|
| Lower-carbon levers | - Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
- Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
- Use classification and product-level EPD research to place this material more precisely.
| No levers surfaced yet. |
|---|
| Accessibility | Private or restricted | Access not recorded across linked works |
|---|
| Related books | | No linked books yet. |
|---|