| Type | work | bureau |
|---|
| Year / years | 2017 | Unrecorded |
|---|
| Place | Abu Dhabi, Abu Dhabi, United Arab Emirates | Unrecorded |
|---|
| Place context | Louvre Delivery Access, أبو ظبي, أبو ظبي, الإمارات العربية المتحدة | Representative site: Staatsstrasse, Hünibach, Bern/Berne, Schweiz/Suisse/Svizzera/Svizra |
|---|
| Climate | 25°C · 13.0h daylight · 7 km/h wind | 12°C · 14.1h daylight · 4 km/h wind · via Hünegg Castle |
|---|
| Focus | Museum | 4 works in corpus |
|---|
| Architects | No architects linked yet. | |
|---|
| Linked context | Bureaus No linked context yet. | Notable works - Hünegg Castle
- Martin-Gropius-Bau
- Mendelssohn Palace
- Biesdorf Palace
|
|---|
| Typologies | - museum
- art museum
- cultural building
| |
|---|
| Materials | | Not recorded yet. |
|---|
| Carbon signals | Aluminum, Concrete, and Steel look like the main embodied-carbon drivers in the current palette. | building and museum gives us a typology starting point even though the work does not have a recorded material palette yet. No dominant drivers yet. |
|---|
| Lower-carbon levers | - Focus on recycled content, lighter assemblies, and careful facade-specification choices.
- Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
- Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
| No levers surfaced yet. |
|---|
| Accessibility | Publicly accessible | 1 of 1 recorded works are publicly accessible |
|---|
| Related books | No linked books yet. | No linked books yet. |
|---|