| Type | work | bureau |
|---|
| Year / years | 1999 | Unrecorded |
|---|
| Place | Tel Aviv, Tel Aviv District, Israel | Unrecorded |
|---|
| Place context | Tel Aviv, Tel Aviv District, Israel | Representative site: Hilterfingen, Hilterfingen, Switzerland |
|---|
| Climate | 20°C · 13.1h daylight · 18 km/h wind | 14°C · 13.9h daylight · 13 km/h wind · via Hünegg Castle |
|---|
| Focus | Mixed-use towers | 4 works in corpus |
|---|
| Architects | No architects linked yet. | |
|---|
| Linked context | Bureaus No linked context yet. | Notable works - Hünegg Castle
- Martin-Gropius-Bau
- Mendelssohn Palace
- Biesdorf Palace
|
|---|
| Typologies | - mixed-use
- skyscraper
- office building
| |
|---|
| Materials | | Not recorded yet. |
|---|
| Carbon signals | Concrete, Steel, and Glass look like the main embodied-carbon drivers in the current palette. | building and museum gives us a typology starting point even though the work does not have a recorded material palette yet. No dominant drivers yet. |
|---|
| Lower-carbon levers | - Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
- Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
- Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
| No levers surfaced yet. |
|---|
| Accessibility | Publicly accessible | 1 of 1 recorded works are publicly accessible |
|---|
| Related books | No linked books yet. | No linked books yet. |
|---|