| Type | work | bureau |
|---|
| Year / years | 1987-1993 | 1931 |
|---|
| Place | Porto, Porto District, Portugal | Berlin, Berlin, Germany |
|---|
| Place context | Porto, Porto District, Portugal | Representative site: Berlin, Berlin, Germany |
|---|
| Climate | 11°C · 13.5h daylight · 4 km/h wind | 5°C · 14.3h daylight · 16 km/h wind · via Berliner Philharmonie |
|---|
| Focus | Architecture school | 1 works in corpus |
|---|
| Architects | | |
|---|
| Linked context | Bureaus | Notable works |
|---|
| Typologies | - education
- school
- campus building
| |
|---|
| Materials | | Not recorded yet. |
|---|
| Carbon signals | Concrete, Glass, and Stucco look like the main embodied-carbon drivers in the current palette. | building gives us a typology starting point even though the work does not have a recorded material palette yet. No dominant drivers yet. |
|---|
| Lower-carbon levers | - Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
- Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
- Use classification and product-level EPD research to place this material more precisely.
| No levers surfaced yet. |
|---|
| Accessibility | Publicly accessible | Access not recorded across linked works |
|---|
| Related books | | No linked books yet. |
|---|