| Type | work | bureau |
|---|
| Year / years | 2009 | 1880 |
|---|
| Place | Illinois, Illinois, United States | Zurich, Zurich, Switzerland |
|---|
| Place context | Illinois, Illinois, United States | Representative site: Bern, Bern, Switzerland |
|---|
| Climate | 0°C · 13.6h daylight · 4 km/h wind | 15°C · 13.9h daylight · 9 km/h wind · via Federal Palace of Switzerland |
|---|
| Focus | Landscape project | 3 works in corpus |
|---|
| Architects | | |
|---|
| Linked context | Bureaus | Notable works - Federal Palace of Switzerland
- Gerbrandy Tower
- Lucerne railway station
|
|---|
| Typologies | | - housing
- civic building
- tower
- building
|
|---|
| Materials | | Not recorded yet. |
|---|
| Carbon signals | Concrete, Steel, and Glass look like the main embodied-carbon drivers in the current palette. | housing, civic building, tower, and building gives us a typology starting point even though the work does not have a recorded material palette yet. No dominant drivers yet. |
|---|
| Lower-carbon levers | - Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
- Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
- Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
- Track sourcing, certification, and assembly logic rather than assuming timber is automatically low impact.
| No levers surfaced yet. |
|---|
| Accessibility | Publicly accessible | 1 of 1 recorded works are publicly accessible |
|---|
| Related books | No linked books yet. | No linked books yet. |
|---|