saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

Sheldon & Tracy Levy Student Learning Centre

Toronto, Ontario, Canada · Exact work coordinates

OpenStreetMap

Sheldon & Tracy Levy Student Learning Centre

Hero image

Seed wave 34 image for Sheldon & Tracy Levy Student Learning Centre.

Credit:

Rights: Unknown · unknown

Field
Sheldon & Tracy Levy Student Learning CentreSheldon & Tracy Levy Student Learning Centre

2015 · Toronto, Ontario, Canada

Gustav PeichlGustav Peichl

1960 · Vienna, Vienna, Austria

Typeworkbureau
Year / years20151960
PlaceToronto, Ontario, CanadaVienna, Vienna, Austria
Place contextToronto, Ontario, CanadaRepresentative site: Stadtbezirk Bonn, Stadtbezirk Bonn, Germany
Climate5°C · 13.7h daylight · 3 km/h wind7°C · 14.2h daylight · 5 km/h wind · via Kunst- und Ausstellungshalle der Bundesrepublik Deutschland
FocusStudent learning center5 works in corpus
Architects
  • Kjetil Trædal Thorsen
  • Gustav Peichl
Linked context

Bureaus

  • Snøhetta

Notable works

  • Kunst- und Ausstellungshalle der Bundesrepublik Deutschland
  • Millennium Tower (Vienna)
  • Donau City
  • Kahlenberg Transmitter
Typologies
  • education
  • student center
  • campus building
  • library
  • museum
  • tower
  • building
Materials
  • glass
  • steel
  • concrete
  • steel
Carbon signals

Concrete, Steel, and Glass look like the main embodied-carbon drivers in the current palette.

  • Concrete
  • Steel
  • Glass

Steel look like the main embodied-carbon drivers in the current palette.

  • Steel
Lower-carbon levers
  • Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
  • Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
  • Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
  • Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
AccessibilityPublicly accessible1 of 1 recorded works are publicly accessible
Related books

No linked books yet.

No linked books yet.