saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

Bait Ur Rouf Mosque in Dhaka, Bangladesh
Bait Ur Rouf Mosque

2012 · Dhaka, Dhaka Division, Bangladesh

Bait Ur Rouf Mosque image

Seed wave 64 image for Bait Ur Rouf Mosque.

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

Bait Ur Rouf Mosque

Dhaka, Dhaka Division, Bangladesh · Exact work coordinates

OpenStreetMap
Field
Bait Ur Rouf MosqueBait Ur Rouf Mosque

2012 · Dhaka, Dhaka Division, Bangladesh

Gustav PeichlGustav Peichl

1960 · Vienna, Vienna, Austria

Typeworkbureau
Year / years20121960
PlaceDhaka, Dhaka Division, BangladeshVienna, Vienna, Austria
Place contextDhaka, Dhaka Division, BangladeshRepresentative site: Stadtbezirk Bonn, Stadtbezirk Bonn, Germany
Climate27°C · 12.8h daylight · 6 km/h wind7°C · 14.2h daylight · 5 km/h wind · via Kunst- und Ausstellungshalle der Bundesrepublik Deutschland
FocusMosque5 works in corpus
Architects
  • Marina Tabassum
  • Gustav Peichl
Linked context

Bureaus

  • Marina Tabassum Architects

Notable works

  • Kunst- und Ausstellungshalle der Bundesrepublik Deutschland
  • Millennium Tower (Vienna)
  • Donau City
  • Kahlenberg Transmitter
Typologies
  • mosque
  • religious architecture
  • civic building
  • museum
  • tower
  • building
Materials
  • brick
  • concrete
  • steel
Carbon signals

Concrete and Brick look like the main embodied-carbon drivers in the current palette.

  • Concrete
  • Brick

Steel look like the main embodied-carbon drivers in the current palette.

  • Steel
Lower-carbon levers
  • Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
  • Review masonry extent, reuse opportunities, and alternate assemblies where the design language allows it.
  • Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
AccessibilityPublicly accessible1 of 1 recorded works are publicly accessible
Related books

No linked books yet.

No linked books yet.