saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

Arctic Cathedral in Tromso, Norway
Arctic Cathedral

1965 · Tromso, Troms, Norway

Arctic Cathedral image

Seed wave 42 image for Arctic Cathedral.

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

Arctic Cathedral

Tromso, Troms, Norway · Exact work coordinates

OpenStreetMap
Field
Arctic CathedralArctic Cathedral

1965 · Tromso, Troms, Norway

Gustav PeichlGustav Peichl

1960 · Vienna, Vienna, Austria

Typeworkbureau
Year / years19651960
PlaceTromso, Troms, NorwayVienna, Vienna, Austria
Place contextTromso, Troms, NorwayRepresentative site: Stadtbezirk Bonn, Stadtbezirk Bonn, Germany
Climate9°C · 16.9h daylight · 14 km/h wind11°C · 14.1h daylight · 7 km/h wind · via Kunst- und Ausstellungshalle der Bundesrepublik Deutschland
FocusParish church5 works in corpus
Architects
  • Jan Inge Hovig
  • Gustav Peichl
Linked context

Bureaus

  • Jan Inge Hovig

Notable works

  • Kunst- und Ausstellungshalle der Bundesrepublik Deutschland
  • Millennium Tower (Vienna)
  • Donau City
  • Kahlenberg Transmitter
Typologies
  • church
  • religious building
  • civic landmark
  • museum
  • tower
  • building
Materials
  • concrete
  • metal
  • glass
  • steel
Carbon signals

Concrete, Glass, and Metal look like the main embodied-carbon drivers in the current palette.

  • Concrete
  • Glass
  • Metal

Steel look like the main embodied-carbon drivers in the current palette.

  • Steel
Lower-carbon levers
  • Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
  • Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
  • Use classification and product-level EPD research to place this material more precisely.
  • Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
AccessibilityPublicly accessible1 of 1 recorded works are publicly accessible
Related books

No linked books yet.

No linked books yet.