| Type | work | bureau |
|---|
| Year / years | 1955 | 1919-1950 |
|---|
| Place | La Plata, Buenos Aires Province, Argentina | Reykjavik, Capital Region, Iceland |
|---|
| Place context | La Plata, Buenos Aires Province, Argentina | Representative site: Reykjavík, Reykjavík, Iceland |
|---|
| Climate | 19°C · 11.0h daylight · 13 km/h wind | 5°C · 15.7h daylight · 16 km/h wind · via Christ the King Cathedral (Reykjavík) |
|---|
| Focus | House-clinic | 5 works in corpus |
|---|
| Architects | No architects linked yet. | |
|---|
| Linked context | Bureaus No linked context yet. | Notable works - Christ the King Cathedral (Reykjavík)
- Akureyrarkirkja
- Hallgrímskirkja
- National Theatre of Iceland
|
|---|
| Typologies | - house
- modernism
- residential building
| - church
- sacred space
- cathedral
- religious building
- landmark
- theatre
- cultural building
- civic building
|
|---|
| Materials | | |
|---|
| Carbon signals | Concrete and Glass look like the main embodied-carbon drivers in the current palette. | Concrete, Glass, and Stone look like the main embodied-carbon drivers in the current palette. |
|---|
| Lower-carbon levers | - Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
- Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
| - Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
- Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
- Check source geography, fabrication intensity, and whether stone is structural, cladding, or finish-only.
|
|---|
| Accessibility | Publicly accessible | 4 of 4 recorded works are publicly accessible |
|---|
| Related books | No linked books yet. | No linked books yet. |
|---|