| Type | work | bureau |
|---|
| Year / years | 1998 | 1919-1950 |
|---|
| Place | Beirut, Beirut Governorate, Lebanon | Reykjavik, Capital Region, Iceland |
|---|
| Place context | Beirut, Beirut Governorate, Lebanon | Representative site: Reykjavík, Reykjavík, Iceland |
|---|
| Climate | 18°C · 13.3h daylight · 4 km/h wind | 6°C · 15.9h daylight · 9 km/h wind · via Christ the King Cathedral (Reykjavík) |
|---|
| Focus | Nightclub | 5 works in corpus |
|---|
| Architects | | |
|---|
| Linked context | Bureaus | Notable works - Christ the King Cathedral (Reykjavík)
- Akureyrarkirkja
- Hallgrímskirkja
- National Theatre of Iceland
|
|---|
| Typologies | - nightclub
- entertainment venue
- adaptive reuse
| - church
- sacred space
- cathedral
- religious building
- landmark
- theatre
- cultural building
- civic building
|
|---|
| Materials | - concrete
- steel
- mirrored surfaces
| |
|---|
| Carbon signals | Concrete, Steel, and Mirrored Surfaces look like the main embodied-carbon drivers in the current palette. - Concrete
- Steel
- Mirrored Surfaces
| Concrete, Glass, and Stone look like the main embodied-carbon drivers in the current palette. |
|---|
| Lower-carbon levers | - Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
- Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
- Use classification and product-level EPD research to place this material more precisely.
| - Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
- Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
- Check source geography, fabrication intensity, and whether stone is structural, cladding, or finish-only.
|
|---|
| Accessibility | Publicly accessible | 4 of 4 recorded works are publicly accessible |
|---|
| Related books | No linked books yet. | No linked books yet. |
|---|