saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

No plan or image is recorded for this slot yet.
Hassan II Mosque

1993 · Casablanca, Casablanca-Settat, Morocco

Casablanca, Casablanca-Settat, Morocco

19°C · 13.2h daylight · 12 km/h wind

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

Hassan II Mosque

Casablanca, Casablanca-Settat, Morocco · City-level coordinates only

OpenStreetMap

Hassan II Mosque

Image 1

Casablanca, Casablanca-Settat, Morocco

Climate: 19°C · 13.2h daylight · 12 km/h wind

Mapping: City-level coordinates only

Field
Hassan II MosqueHassan II Mosque

1993 · Casablanca, Casablanca-Settat, Morocco

Gonçalo Byrne ArquitectosGonçalo Byrne Arquitectos

1968 · Lisbon, Lisbon District, Portugal

Typeworkbureau
Year / years19931968
PlaceCasablanca, Casablanca-Settat, MoroccoLisbon, Lisbon District, Portugal
Place contextCasablanca, Casablanca-Settat, MoroccoRepresentative site: Lisbon, Lisbon, Portugal
Climate19°C · 13.2h daylight · 12 km/h wind17°C · 13.5h daylight · 14 km/h wind · via Instituto Superior de Ciências Sociais e Políticas
FocusMosque2 works in corpus
Architects

No architects linked yet.

  • Goncalo Byrne
Linked context

Bureaus

No linked context yet.

Notable works

  • Instituto Superior de Ciências Sociais e Políticas
  • Lisbon Harbor Control Tower
Typologies
  • mosque
  • religious building
  • waterfront building
  • education
  • campus building
  • performance venue
  • tower
Materials
  • marble
  • granite
  • wood

Not recorded yet.

Carbon signals

Stone and Stone look like the main embodied-carbon drivers in the current palette.

  • Stone
  • Stone

education, campus building, performance venue, and tower gives us a typology starting point even though the work does not have a recorded material palette yet.

No dominant drivers yet.

Lower-carbon levers
  • Check source geography, fabrication intensity, and whether stone is structural, cladding, or finish-only.
  • Track sourcing, certification, and assembly logic rather than assuming timber is automatically low impact.

No levers surfaced yet.

AccessibilityPublicly accessible1 of 1 recorded works are publicly accessible
Related books

No linked books yet.

No linked books yet.