saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

Futuna Chapel in Wellington, New Zealand
Futuna Chapel

1961 · Wellington, Wellington, New Zealand

Futuna Chapel image

Seed wave 58 image for Futuna Chapel.

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

Futuna Chapel

Wellington, Wellington, New Zealand · Exact work coordinates

OpenStreetMap
Field
Futuna ChapelFutuna Chapel

1961 · Wellington, Wellington, New Zealand

Gonçalo Byrne ArquitectosGonçalo Byrne Arquitectos

1968 · Lisbon, Lisbon District, Portugal

Typeworkbureau
Year / years19611968
PlaceWellington, Wellington, New ZealandLisbon, Lisbon District, Portugal
Place contextWellington, Wellington, New ZealandRepresentative site: Lisbon, Lisbon, Portugal
ClimateClimate unavailableClimate unavailable · via Instituto Superior de Ciências Sociais e Políticas
FocusChapel2 works in corpus
Architects
  • John Scott
  • Goncalo Byrne
Linked context

Bureaus

  • John Scott

Notable works

  • Instituto Superior de Ciências Sociais e Políticas
  • Lisbon Harbor Control Tower
Typologies
  • chapel
  • religious building
  • modernism
  • education
  • campus building
  • performance venue
  • tower
Materials
  • concrete
  • timber

Not recorded yet.

Carbon signals

Concrete look like the main embodied-carbon drivers in the current palette.

  • Concrete

education, campus building, performance venue, and tower gives us a typology starting point even though the work does not have a recorded material palette yet.

No dominant drivers yet.

Lower-carbon levers
  • Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
  • Track sourcing, certification, and assembly logic rather than assuming timber is automatically low impact.

No levers surfaced yet.

AccessibilityPublicly accessible1 of 1 recorded works are publicly accessible
Related books

No linked books yet.

No linked books yet.