saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

No plan or image is recorded for this slot yet.
Butaro Hospital

2011 · Butaro, Northern Province, Rwanda

Butaro, Northern Province, Rwanda

15°C · 12.1h daylight · 10 km/h wind

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

Butaro Hospital

Butaro, Northern Province, Rwanda · Exact work coordinates

OpenStreetMap

Butaro Hospital

Image 1

Butaro, Northern Province, Rwanda

Climate: 15°C · 12.1h daylight · 10 km/h wind

Mapping: Exact work coordinates

Field
Butaro HospitalButaro Hospital

2011 · Butaro, Northern Province, Rwanda

Gonçalo Byrne ArquitectosGonçalo Byrne Arquitectos

1968 · Lisbon, Lisbon District, Portugal

Typeworkbureau
Year / years20111968
PlaceButaro, Northern Province, RwandaLisbon, Lisbon District, Portugal
Place contextButaro, Northern Province, RwandaRepresentative site: Lisbon, Lisbon, Portugal
Climate15°C · 12.1h daylight · 10 km/h wind13°C · 13.4h daylight · 5 km/h wind · via Instituto Superior de Ciências Sociais e Políticas
FocusHospital2 works in corpus
Architects

No architects linked yet.

  • Goncalo Byrne
Linked context

Bureaus

  • MASS Design Group

Notable works

  • Instituto Superior de Ciências Sociais e Políticas
  • Lisbon Harbor Control Tower
Typologies
  • hospital
  • healthcare
  • medical campus
  • education
  • campus building
  • performance venue
  • tower
Materials
  • stone
  • concrete
  • steel

Not recorded yet.

Carbon signals

Concrete, Steel, and Stone look like the main embodied-carbon drivers in the current palette.

  • Concrete
  • Steel
  • Stone

education, campus building, performance venue, and tower gives us a typology starting point even though the work does not have a recorded material palette yet.

No dominant drivers yet.

Lower-carbon levers
  • Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
  • Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
  • Check source geography, fabrication intensity, and whether stone is structural, cladding, or finish-only.

No levers surfaced yet.

AccessibilityPublicly accessible1 of 1 recorded works are publicly accessible
Related books

No linked books yet.

No linked books yet.