saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

No plan or image is recorded for this slot yet.
Stadtcasino Basel

Unknown · Basel, Basel, Switzerland

Basel, Basel, Switzerland

10°C · 13.9h daylight · 3 km/h wind

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

Stadtcasino Basel

Basel, Basel, Switzerland · Exact work coordinates

OpenStreetMap

Stadtcasino Basel

Image 1

Basel, Basel, Switzerland

Climate: 10°C · 13.9h daylight · 3 km/h wind

Mapping: Exact work coordinates

Field
Stadtcasino Basel

Unknown · Basel, Basel, Switzerland

Gehry PartnersGehry Partners

1962 · Los Angeles, California, United States

Typeworkbureau
Year / yearsUnknown1962
PlaceBasel, Basel, SwitzerlandLos Angeles, California, United States
Place contextBasel, Basel, SwitzerlandRepresentative site: Los Angeles, Spain, Spain
Climate10°C · 13.9h daylight · 3 km/h wind16°C · 13.6h daylight · 3 km/h wind · via Bodegas Marqués de Riscal
FocusArchitecture42 works in corpus
Architects
  • Melchior Berri
  • Frank Gehry
Linked context

Bureaus

  • Melchior Berri

Notable works

  • Bodegas Marqués de Riscal
  • Art Gallery of Ontario
  • Toledo Museum of Art
  • Weisman Art Museum
Typologies
  • building
  • building
  • museum
  • gallery
  • library
  • house
  • campus building
  • education
  • performance venue
Materials

Not recorded yet.

  • glass
  • stone
  • wood
  • steel
  • titanium
  • limestone
Carbon signals

building gives us a typology starting point even though the work does not have a recorded material palette yet.

No dominant drivers yet.

Steel, Glass, and Stone look like the main embodied-carbon drivers in the current palette.

  • Steel
  • Glass
  • Stone
Lower-carbon levers

No levers surfaced yet.

  • Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
  • Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
  • Check source geography, fabrication intensity, and whether stone is structural, cladding, or finish-only.
  • Use classification and product-level EPD research to place this material more precisely.
AccessibilityAccess not recorded22 of 22 recorded works are publicly accessible
Related books

No linked books yet.

No linked books yet.