saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

Goodwood Park Hotel in Orchard, Singapore
Goodwood Park Hotel

1900 · Orchard, Orchard, Singapore

Goodwood Park Hotel image

Hotel in Singapore

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

Goodwood Park Hotel

Orchard, Orchard, Singapore · Exact work coordinates

OpenStreetMap
Field
Goodwood Park HotelGoodwood Park Hotel

1900 · Orchard, Orchard, Singapore

Foster + PartnersFoster + Partners

Abu Dhabi, United Arab Emirates

Typeworkbureau
Year / years1900Unrecorded
PlaceOrchard, Orchard, SingaporeAbu Dhabi, United Arab Emirates
Place contextOrchard, Orchard, SingaporeRepresentative site: Dresden, Dresden, Germany
Climate27°C · 12.2h daylight · 3 km/h wind6°C · 14.2h daylight · 11 km/h wind · via Dresden Hauptbahnhof
FocusHouse55 works in corpus
Architects
  • Swan & Maclaren Group
  • Norman Foster
Linked context

Bureaus

  • Swan & Maclaren Group

Notable works

  • Dresden Hauptbahnhof
  • Reichstag building
  • British Library of Political and Economic Science
  • Cohen House, London
Typologies
  • house
  • hospitality
  • landscape
  • building
  • library
  • education
  • house
  • church
  • sacred space
  • museum
  • gallery
Materials
  • timber
  • glass
  • steel
  • granite
  • ETFE
  • wood
  • concrete
  • stone
Carbon signals

The recorded material palette leans lower-carbon on paper, but procurement and quantity still matter.

No dominant drivers yet.

Concrete, Steel, and ETFE look like the main embodied-carbon drivers in the current palette.

  • Concrete
  • Steel
  • ETFE
Lower-carbon levers
  • Track sourcing, certification, and assembly logic rather than assuming timber is automatically low impact.
  • Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
  • Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
  • Use classification and product-level EPD research to place this material more precisely.
  • Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
AccessibilityPublicly accessible10 of 10 recorded works are publicly accessible
Related books

No linked books yet.

No linked books yet.