saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

David Citadel Hotel in Jerusalem, Israel
David Citadel Hotel

1998 · Jerusalem, Jerusalem, Israel

David Citadel Hotel image

Hotel in Jerusalem

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

David Citadel Hotel

Jerusalem, Jerusalem, Israel · Exact work coordinates

OpenStreetMap
Field
David Citadel HotelDavid Citadel Hotel

1998 · Jerusalem, Jerusalem, Israel

Foster + PartnersFoster + Partners

Abu Dhabi, United Arab Emirates

Typeworkbureau
Year / years1998Unrecorded
PlaceJerusalem, Jerusalem, IsraelAbu Dhabi, United Arab Emirates
Place contextJerusalem, Jerusalem, IsraelRepresentative site: Dresden, Dresden, Germany
Climate11°C · 13.1h daylight · 17 km/h wind6°C · 14.2h daylight · 11 km/h wind · via Dresden Hauptbahnhof
FocusArchitecture55 works in corpus
Architects
  • Moshe Safdie
  • Norman Foster
Linked context

Bureaus

  • Safdie Architects

Notable works

  • Dresden Hauptbahnhof
  • Reichstag building
  • British Library of Political and Economic Science
  • Cohen House, London
Typologies
  • hospitality
  • building
  • library
  • education
  • house
  • church
  • sacred space
  • museum
  • gallery
Materials

Not recorded yet.

  • glass
  • steel
  • granite
  • ETFE
  • wood
  • concrete
  • stone
Carbon signals

hospitality gives us a typology starting point even though the work does not have a recorded material palette yet.

No dominant drivers yet.

Concrete, Steel, and ETFE look like the main embodied-carbon drivers in the current palette.

  • Concrete
  • Steel
  • ETFE
Lower-carbon levers

No levers surfaced yet.

  • Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
  • Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
  • Use classification and product-level EPD research to place this material more precisely.
  • Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
AccessibilityAccess not recorded10 of 10 recorded works are publicly accessible
Related books

No linked books yet.

No linked books yet.