saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

No plan or image is recorded for this slot yet.
Silodam

1995 · Amsterdam, Amsterdam, Netherlands

Amsterdam, Amsterdam, Netherlands

10°C · 14.2h daylight · 16 km/h wind

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

Silodam

Amsterdam, Amsterdam, Netherlands · Exact work coordinates

OpenStreetMap

Silodam

Image 1

Amsterdam, Amsterdam, Netherlands

Climate: 10°C · 14.2h daylight · 16 km/h wind

Mapping: Exact work coordinates

Field
Silodam

1995 · Amsterdam, Amsterdam, Netherlands

Enric MirallesEnric Miralles

1984-2000 · Barcelona, Catalonia, Spain

Typeworkbureau
Year / years19951984-2000
PlaceAmsterdam, Amsterdam, NetherlandsBarcelona, Catalonia, Spain
Place contextAmsterdam, Amsterdam, NetherlandsRepresentative site: Igualada, Catalonia, Spain
Climate10°C · 14.2h daylight · 16 km/h wind17°C · 13.5h daylight · 4 km/h wind · via Igualada Cemetery
FocusHousing3 works in corpus
Architects
  • Winy Maas
  • Enric Miralles
Linked context

Bureaus

  • MVRDV

Notable works

  • Igualada Cemetery
  • Pabellón Pedro Ferrándiz
  • Camp Olímpic de Tir amb Arc
Typologies
  • housing
  • cemetery
  • landscape architecture
  • civic infrastructure
  • building
Materials

Not recorded yet.

  • concrete
  • earth
  • stone
Carbon signals

housing gives us a typology starting point even though the work does not have a recorded material palette yet.

No dominant drivers yet.

Concrete, Earth, and Stone look like the main embodied-carbon drivers in the current palette.

  • Concrete
  • Earth
  • Stone
Lower-carbon levers

No levers surfaced yet.

  • Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
  • Use classification and product-level EPD research to place this material more precisely.
  • Check source geography, fabrication intensity, and whether stone is structural, cladding, or finish-only.
AccessibilityAccess not recorded1 of 1 recorded works are publicly accessible
Related books

No linked books yet.

No linked books yet.