saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

Matchstick Palace in Stockholm, Sweden
Matchstick Palace

1928 · Stockholm, Stockholm, Sweden

Matchstick Palace image

Building in Stockholm, Sweden

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

Matchstick Palace

Stockholm, Stockholm, Sweden · Exact work coordinates

OpenStreetMap
Field
Matchstick PalaceMatchstick Palace

1928 · Stockholm, Stockholm, Sweden

Eero Saarinen and AssociatesEero Saarinen and Associates

1950 · Bloomfield Hills, Michigan, United States

Typeworkbureau
Year / years19281950
PlaceStockholm, Stockholm, SwedenBloomfield Hills, Michigan, United States
Place contextStockholm, Stockholm, SwedenRepresentative site: Milwaukee, Milwaukee, United States
Climate7°C · 15.1h daylight · 17 km/h wind13°C · 13.7h daylight · 11 km/h wind · via Milwaukee Art Museum
FocusOffice building12 works in corpus
Architects
  • Ivar Tengbom
  • Eero Saarinen
Linked context

Bureaus

  • Ivar Tengbom

Notable works

  • Milwaukee Art Museum
  • Kresge Auditorium
  • MIT Chapel
  • Concordia Senior College
Typologies
  • office
  • museum
  • gallery
  • infrastructure
  • campus building
  • chapel
  • sacred space
  • church
  • education
Materials

Not recorded yet.

  • steel
  • concrete
Carbon signals

office gives us a typology starting point even though the work does not have a recorded material palette yet.

No dominant drivers yet.

Concrete and Steel look like the main embodied-carbon drivers in the current palette.

  • Concrete
  • Steel
Lower-carbon levers

No levers surfaced yet.

  • Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
  • Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
AccessibilityAccess not recorded8 of 8 recorded works are publicly accessible
Related books

No linked books yet.

No linked books yet.